Market Sector
Industrial
Structural Engineer
Marbas
Location
Guilford
Appointment Type
Performance Design/Sustainability
Client
Amiri Construction Ltd
Architect
Boyle and Summers
Phase 1 comprised of 18 industrial
units and Phase 2 featured 3 large-scale units of varying sizes.
The scheme was designed to support
flexible industrial and commercial use, meeting the growing demand for
high-quality, modern workspace in the region.
The total commercial floorspace
delivered by the Burnt Common Nurseries development was approximately 7,213 m²,
spanning both phases of construction.
Cooper Homewood were appointed to provide mechanical and electrical design services from RIBA Stages 1 to 3+, supporting the early strategic and developed design phases of the project.
In addition to the design scope, Cooper
Homewood carried out SBEM calculations for both the ‘As Designed’ and ‘As
Built’ stages, ensuring full compliance with Part L of the Building
Regulations. This also included the provision of an Energy Performance
Certificate (EPC), supporting the project’s environmental performance and
handover requirements.
Services used in this project
Mechanical, Electrical and Public Health Building Services Engineering Design
Project Feasibility and Planning
Performance Duties - Specification and Drawings
MEP Infrastructure Design
Energy Calculations and Strategies
Thermal Modelling and Overheating Assessments
BIM (Building Information Modelling)
Low-Carbon Technology Design