This project comprised of the new construction of 1no. industrial unit, GIA of circa 416sqm, on a total site area of circa 1069sqm.


Market Sector
Industrial

Structural Engineer
Crouch Waterfall

Location
Chichester, Hampshire

Appointment Type
Detailed Design, SBEM Calculations, Energy Strategy

Client
Oldham Seals Ltd

Architect
PWP Architects Ltd


The unit comprised of 2No. floors and car parking of up to 12No spaces, with additional cycle parking and 4No visitor car parking bays, finally with 2No. spaces for LGV/ Vans to park. 

 The new industrial unit was built as an extension to the existing Oldham Seals site in Chichester.

Cooper Homewood were appointed to complete RIBA Stages 1 – 6, SBEM Calculations, and the Energy Strategy

Services used in this project

Mechanical, Electrical and Public Health Building Services Engineering Design

Project Feasibility and Planning

Full-Detailed Design - Specification and Drawings

MEP Infrastructure Design

Energy Calculations and Strategies

Thermal Modelling and Overheating Assessments

BIM (Building Information Modelling)

Tender Documentation, Breakdown and Analysis

Site Inspections and Construction Monitoring

Contact us about this project.

London Office

The Foundry Business Centre
156 Blackfriars Road, Southwark, London SE1 8EN

T: 02071 990 359

Find us

Fareham Office

Ailsa, 3 Turnberry House
4400 Parkway
Solent Business Park
Whiteley
Fareham
PO15 7FJ

T: 01489 346 700

Find us

Bournemouth Office

Suite 3
Colonnade House
2 Westover Road
Bournemouth
BH1 2BY

T: 01202 078 130

Find us

Company No. 07627650
VAT Registration No. 112683335

View our Privacy Statement View our Quality Management System Policy