Market Sector
Residential
Structural Engineer
Escher Silverman
Location
The Winchester Laundry Site , SO23 7TR
Appointment Type
Detailed Design
Client
Drew Smith Homes
Architect
T2 Architects
The project comprised fourteen private
homes, including seven two-bedroom, six four-bedroom, and one three-bedroom
houses, alongside a three-storey office building, designed for multi-tenant
occupation with separate access per floor.
Cooper Homewood Ltd were appointed to deliver full engineering consultancy services.
Our scope included the design of heating and domestic water systems, an incoming services strategy, bespoke lighting design, lift specification, and the integration of advanced building technologies such as audio-visual systems, lighting controls, and a communal satellite distribution network, ensuring a modern and highly serviced development.
Services used in this project
Mechanical, Electrical and Public Health Building Services Engineering Design
Full-Detailed Design - Specification and Drawings
Lighting Design
MEP Infrastructure Design
Energy Calculations and Strategies
BIM (Building Information Modelling)
Audio Visual Performance Design